news information INDEX > news information > News Center > What should be paid attention to when the construction of truck scale?

What should be paid attention to when the construction of truck scale?

Time:2021.03.26     News sources: Hebei Chaoda Sealing Products Co., Ltd

Matters needing attention in construction of truck scale

1. The form of truck balance foundation pit:

There are two kinds of foundation pit forms of truck scale, one is non-foundation pit and the other is shallow foundation pit. Shallow foundation pit refers to the installation method in which the truck scale is installed in the foundation pit, and the surface of the scale is level with the ground. The truck scale without foundation pit is installed above the ground, which can be frequently cleaned and does not accumulate water, and the cost is relatively cheap. Generally choose the installation method of truck scale without foundation pit.

2. Location:

The installation position of the truck scale should have good drainage channels, which will not be submerged by heavy rain or mountain torrent. For shallow foundation pit, drainage channels should be set up. In addition, the two ends of the truck scale must have a sufficient length of straight road for the car up and down the scale platform, both ends of the straight road should be at least equal to the length of the scale platform.

Another factor that affects where the weighing machine is installed is the number of cars you weigh each day. If you only weigh about 20 cars a day, - Taiwan truck scale should be enough, to set up a two-phase road weighing; If every day to balance about 50 cars, you need to prepare a parking place, - Taiwan truck balance should be enough, and then prepare - a side road; If there are far more than 100 cars per day, you should consider using two truck scales at the same time, each capable of weighing heavy or empty cars in both directions and with sidewalks.

You should consider: Where should the car be parked? Will there be a line for weighing? What happens when it snows, or rains heavily, or during peak season? And so on, all need you to take attention.

3. The basis:

The truck scale must be poured concrete foundation, this foundation must be excavated below the local permafrost line, in the construction should ensure the concrete label, casting embedded parts is to ensure the horizontal degree, position degree and other geometric dimensions, in the pouring of concrete to ensure that the embedded parts do not shift. After foundation pouring is completed, it should be maintained and mixed according to civil engineering specifications. The truck scale can not be installed until the concrete reaches the designed strength index. If you want to shorten the maintenance period, it is allowed to add "early strength agent" and other measures under the guidance of professional and technical personnel during construction. In order to protect against lightning, you should set the root ground pile according to the local conditions, and ensure the grounding resistance of 4 ohms, from the center position of the weighing platform to the weighing room should be laid -- root iron pipe, used to cross the signal cable.

4 pounds of room:

The weighing room should be close to the truck scale, so as to place the weighing instrument, or the computer, printer and other equipment. In addition, to ensure that the chief weighing officer can also communicate with the driver, the secretary of scale sheet, ensure that the car on the scale, identify the car 5. Installation and verification: after the installation and debugging of the truck scale, the Bureau of Metrology Supervision will verify it and issue a certificate of qualification before it is officially used

 

≡  contacts:Manager Wang ≡  mobile:13930926376 ≡  Telephone:0319-2158243 ≡  fax:0319-2159641 ≡  address:No. 1 in Rongtai science and Technology Incubation Park, south of Xingda street, Xingtai Economic Development Zone
河北超達(dá)密封
版權(quán)所有:邢臺(tái)德港電子有限公司       網(wǎng)站備案/許可證號(hào):       

冀公網(wǎng)安備 13050902000085號(hào)

技術(shù)支持:邢臺(tái)市網(wǎng)商軟件開發(fā)有限公司
主站蜘蛛池模板: av亚欧洲日产国码无码 | 99精品国产麻豆婷婷 | 国产精品成人无码视频 | 成人无码视频观看 | 91精品国产福利在线观看 | 国产在线精品国自 | 91久久另类重 | 国产一区二区精品久久麻豆 | 国产黄视频网站 | 岛国岛国免费v片在线观看 岛国动作片免费免费全集观看 | 国产午夜激无码v毛 | 国产成人无码一二三区视频 | 国产盗摄精品一区二区 | 国产成人精品免费视频大全可播 | 国产精品视频一区二区 | 国产日韩精品一区二区三区在线 | 国产成人久久婷婷精 | 1024你懂的在线播放欧日韩 | 福利一区二区三区在线视频 | 国产成人av在线影院 | 国产精品美女在线观看 | av无码一区二区在线观看 | 国产精品无需 | av免费大片在线观看 | 99久久婷婷国产自综合青草 | 国产午夜精品久久理论片小 | 国产欧美成人精品 | 国产黑色丝袜在线观看一区 | 国产成人黄网站在线观看软件 | 国产精品亚洲五月天高清 | 国产一线天粉嫩馒头极品av | 国产最火爆久久久久国产一级毛片 | 成人综合网站在线 | 国产三级黄片一区二区三区 | 黄色视频一区二区 | 成人做受120秒试看试看视频 | 国产精品国产三级国产成人 | 国产av无码日韩av无码网站 | 国产精品无码无卡在线观看 | 国产交换配乱婬视频a | 国产女主播在线观看五月 |